Order Entry in real trend
Monthly Order Entry curve cross-BU. Detect drops before they become a quarterly figure.
Opportunity pipeline with real probability, versioned multi-currency quotes, engineering projects in 11 steps and reliable Order Entry forecast. All connected to your operation, Make and Claude.
Energía Hub · CRM
Opportunity pipeline
Drag between stages · weighted value live
Click an opportunity to see the detail
11
steps
per project traced end-to-end
3
currencies
USD · DOP · EUR in one quote
1
project number
the same one in site, purchasing and finance
L1
the margin
recalculated, awaiting a decision
LIVE DATA
What your management sees every morning: Order Entry vs. forecast, win→project automation, margin per project and performance per business unit.
Monthly Order Entry curve cross-BU. Detect drops before they become a quarterly figure.
When an opportunity is won, the project starts on its own and the forecast updates under the written rule.
Order Entry per business unit × month. Detect which BU is cooling before quarter end.
Close margin per active project. PRY-031 leading, PRY-027 under pressure.
7 active projects · average margin 20.6%
WHERE ORDER STARTS
In engineering, electrical distribution and industrial equipment, opportunities, quotes, kickoffs, margin and forecast are already managed with spreadsheets and email. The system chains them into one process, with a single source of truth and a person approving whatever commits a price.
Today “how is the quarter going?” is answered with an outdated spreadsheet or with what the sales rep remembers. When that rep leaves, the history leaves too. In the system, every opportunity has a stage, a weighted amount and a record of each change.
Today the quote is built in USD, the client asks for DOP, engineering changes a line item and several versions of the same file circulate by email. Sometimes a price is signed on an old version. In the system, every quote has its current version, its history and its margin calculated before it is sent.
Today engineering hears about the close late, through a message, and the schedule starts behind. In the system, the won opportunity creates the project with its scope and notifies engineering the moment it closes.
Today the quoted margin and the closing margin are compared at the end, when the last invoice arrives. Supplier costs, scope changes and delays add up without anyone seeing the number. In the system, every cost is charged to the project as it is recorded and the deviation shows in time.
Today the forecast is assembled every quarter by pasting each rep’s spreadsheet, and by the time it is ready it has already changed. Management decides hiring and inventory on weeks-old data. In the system, Order Entry and the forecast are calculated from live opportunities.
LIVE SYSTEM
A navigable version of the system, with fictional data: click, filter and open each record. These are the four modules your team will operate every day.
Kanban drag-drop from Prospect to Lost. Each opportunity with code, client, BU, value, GO%/GET% probability and margin. Claude flags when real probability does not match the assigned one.
↓ Interactive · demo data
Energía Hub · CRM
Opportunity pipeline
Drag between stages · weighted value live
Click an opportunity to see the detail
Line items with cost + margin per item, ITBIS and total. USD/DOP/EUR toggle. Versioning with flow Draft → Sent → Approved. Only the approved version is what the client sees at /oferta.
↓ Interactive · demo data
Energía Hub · Quote
COT-2026-0142 · Grupo Latitud
34.5kV substation — North Plant
Switch currency · click a line item to edit
| Description | Qty | Cost | Margin | Price |
|---|---|---|---|---|
| Three-phase 500kVA transformer 13.8kV/480V | 2 | US$ 18,500 | 22% | US$ 45,140 |
| MCC distribution switchboard + protections | 1 | US$ 31,200 | 19% | US$ 37,128 |
| Detailed engineering and site supervision | 1 | US$ 14,800 | 28% | US$ 18,944 |
| Installation, testing and commissioning | 1 | US$ 9,600 | 24% | US$ 11,904 |
The project is created automatically when the opportunity is won. Order → Offer → Calculation → Supplier Invoices/Payments → Client Invoices/Payments → Engineering → Delivery → Gantt → Information, with attachments per step and OE → revenue timeline.
↓ Interactive · demo data
Energía Hub · Project
PRY-2026-031 · Transformer bank
Grupo Latitud · created automatically when OP-2026-002 was won
Step 4 of 11 · active
Supplier inv.
Attachments
Kanban Pending / In Progress / Completed. Each task with priority, assignee and linked to project, client or prospect. @mentions notify in real time and Claude summarizes threads that require your response.
↓ Interactive · demo data
Energía Hub · Tasks
Team board
Linked to project, customer and lead · @mentions notify
Claude summarized: 3 mentions need your reply
No tasks in progress
WHAT THE SYSTEM DOES
The critical modules for the sector are already solved and adapt to your process.
Prospects → Proposal → Negotiation → On Hold → Won → Invoiced → Lost. Drag-drop, GO%/GET% probability, weighted value and margin per opportunity.
Line items with cost + margin per item, ITBIS, USD/DOP/EUR, versioning and approval flow Draft → Sent → Approved.
When an opportunity is moved to Won, the system creates the project, copies the line items and notifies engineering on the spot. Zero late starts.
Order → Offer → Calculation → Supplier Invoices → Supplier Payments → Client Invoices → Client Payments → Engineering → Delivery → Gantt → Information, with attachments per step.
Task Kanban (Pending / In Progress / Completed), priority, assignee, linked to client/project/prospect. @mentions notify in real time.
Order Entry prior year vs. current vs. forecast vs. budget, pipeline by stage and margins. Reliable forecast without building Excels by hand.
Each approved quote generates a URL /oferta/:id that the client opens without login: line items, total, currency and current version, with digital acceptance.
Project margin is recalculated with every supplier invoice and scope change. You see it while the project runs, not at close.
Each role sees exactly their own data: the sales rep does not see overall margin, engineering does not edit prices, management sees everything consolidated.
CONNECTED STACK
We connect the tools you already use and the ones worth adopting.
Real close probability, proposal drafting, margin analysis and @mention summaries
Engineering project management, schedules and synchronized team boards
Industrial prospect pipeline with automatic scoring and multi-channel capture
Won opportunity notifications, @mentions and quote approval
Webhooks to ERPs, accounting and legacy systems of the engineering company
Database, Deno Edge Functions for integrations and realtime notifications, attachment storage
LIVE SYSTEM · Grupo Latitud
A demo company’s system, with its modules, agents and rules at work. Follow the guide or browse freely.
Modules in this tour
Boosty Standard for Operating with AISimulated AI · demo data
FEATURED CASE
An energy engineering and electrical distribution company with multi-currency projects ran its pipeline in Excel and assembled the forecast by hand every quarter. We built a CRM + commercial ERP: a Kanban pipeline with probability, versioned multi-currency quotes and eleven-step engineering projects created the moment the opportunity is won. The margin is visible while the project runs: when it falls below the floor, the system recalculates it, explains it and waits for a person to decide.
11
steps per project, traced with attachments
3
currencies (USD/DOP/EUR) in a single versioned quote
1
project number: the same one in site, purchasing and finance
B-O-O-S-T-Y METHODOLOGY
This is how an end-to-end implementation is chained: every bar is a concrete task, with the role that owns it, and the marker runs through the sequence. The calendar is set in the assessment, with your team and your timing.
F1
Assessment
F2
Architecture
F3
Build
F4
Adoption
Yes. The architecture is agnostic: we connect to any system that exposes a REST (or SOAP) API — commercial ERPs, accounting or proprietary systems. If your ERP is legacy without an API, we connect it via Make/n8n with webhooks. The commercial layer (pipeline + quotes + projects) lives on top of your current accounting, without replacing it.
Claude analyzes the historical behavior of similar opportunities (stage, age, value, client, BU, recent activity) and contrasts the GO%/GET% assigned by the sales rep with the actual close rate from your own data. When there is misalignment, it flags it: "real probability 78% — move to Negotiation". It is a suggestion; the sales rep decides.
When an opportunity moves to the Won column, the system creates the engineering project, copies the line items from the approved quote, initializes the 11 steps and notifies engineering and the PM on the spot (in-app + WhatsApp). The project starts the same day it is signed, not three weeks later.
Each quote has line items with cost + margin per item, ITBIS and total. Currency toggle USD/DOP/EUR with configurable rate. Each change generates a version (v1, v2, v3...) with its status (Draft → Sent → Approved). Only the Approved version is current and what the client sees at /oferta/:id. Goodbye to "which Excel was the right one?".
No. We replicate your exact current cost + margin per line item logic, even if it is in Excel today. What changes is that the calculation is live, versioned and auditable — but the formulas are yours and we respect them 100%.
The project margin is recalculated with every supplier invoice loaded and every scope change. On the dashboard you see quoted margin vs. real project margin while it runs. If a project is eating its margin, you see it in week 3, not on the final invoice.
Yes, we migrate your pipeline and project portfolio. Bulk XLSX import with integrity validation (opportunity ↔ client ↔ quote ↔ project). We do it in parallel with implementation; it is not a blocker.
Scope and model are defined in the assessment. They depend on the number of users and business units, the integrations and the project volume. Schedule a 30-minute assessment and we put it in writing.

A WORD FROM THE FOUNDER
“In engineering, margin is protected in the versioned quote and in the project that starts the day it is won.”
An engineering company protects margin the way a construction site protects its drawings: one current version, and everyone working from it. When the pipeline lives in the sales rep’s head, the quote in four spreadsheets with the same name, and engineering learns on WhatsApp that the bid was won, margin leaks between versions before the work starts.
We build the layer with Claude that orders the pipeline with its probability, versions every multi-currency quote and creates the project the day it is won, with engineering notified and the margin visible while the project runs. When the margin falls below the floor, the system recalculates it, explains it and waits for a person to decide.
For the company, that means one project number for site, purchasing and finance, and the margin in view for the whole project. Book 30 minutes with me: I’ll tell you what can be put in order first, what we would build and how we would measure it. Which version of the quote is your last won project running on today?

Gabriel Montiel
CEO · Boosty Digital
GET STARTED
Schedule a 30-minute assessment. We will tell you what to organize first, what we would build and how it would be measured. No corporate presentation.